Warmly celebrate the successful passage of our company's 12kV environmental protection gas insulation primary and secondary fusion ring main cage through the test
Date:2022-1-17
Our company's latest development of 12kV environmental protection gas insulation primary and secondary fusion ring network box has the characteristics of simple structure, flexible operation, reliable interlocking and convenient installation, which is a low-carbon, environmentally friendly and intelligent new technology product promoted by the power grid, and its characteristics are as follows:1. To meet the requirements of electrical verification and nuclear phase, the cable fault indicator with cable fault alarm and cable terminal temperature measurement function is configured; 2. The power supply, current, remote signaling, remote control and other circuits of all ring network units adopt standardized interface design, and are summarized to the terminal unit aviation plug room of the station through the secondary aviation plug, and the core control unit hardware adopts high-performance processors to ensure the accuracy and stability of the system; 3. Powerful processing capacity, data collection, data processing parallel, at the same time support software encryption and hardware encryption functions, to meet the requirements of State Grid information security detection, support line loss collection, through the serial port and distribution line loss collection module connection communication collection measurement data, and upload the data; 4. It has the functions of three remote (telemetry, remote signaling, remote control), metering, interphase and grounding fault handling, communication, secondary power supply, etc., and has the ability to provide supporting power supply for communication equipment, distribution line loss acquisition module and switch action at the same time; 5. The interface definition and structure are unified, the compatibility and interchangeability are good, the advantage is that the construction is in place at one time, the overall appearance, and greatly improve the standardization and reliability of the overall equipment; 6. The automatic commissioning time of on-site distribution network can also be greatly shortened, and the on-site installation efficiency can be improved.